Totea gas field
Since 2011, the development of the gas infrastructure in the Totea / Gorj area has started. The development works included the drilling of five deep wells and the construction of the Totea 4540 gas production park.
The natural gas from Totea is transported through 25 km of pipelines to the Hurezani hub to be treated and then delivered to the national transport system.
Only the Totea 4461 well can produce up to 500,000 m2 / day.
Roconsult specialists have been working on:
- Design of ESD monitoring and control cabinets
- Delivery and installation of fiber optic cable
- Installation of equipment and cables in the field for automation cabinets
Totea gas field
Since 2011, the development of the gas infrastructure in the Totea / Gorj area has started. Development work included drilling five deep wells and building the Totea 4540 gas production park.
Totea natural gas is transported through 25 km of pipelines to the Hurezani hub to be treated and then delivered to the national transmission system.
Only the Totea 4461 well can produce up to 500,000 m2 / day.
Roconsult specialists have been working on:
from the beginning- Design of ESD monitoring and control cabinets
- Delivery and installation of fiber optic cable
- Installation of equipment and cables in the field for automation cabinets